Welcome! Please use the navigational links to explore our website.
PartsASAP LogoCompany Logo (800) 853-2651

Shop Now

   Allis Chalmers Case Farmall IH Ford 8N,9N,2N Ford
   Ferguson John Deere Massey Ferguson Minn. Moline Oliver
 
Marketplace
Classified Ads
Photo Ads
Tractor Parts
Salvage

Community
Discussion Forums
Project Journals
Your Stories
Events Calendar
Hauling Schedule

Galleries
Tractor Photos
Implement Photos
Vintage Photos
Help Identify
Parts & Pieces
Stuck & Troubled
Vintage Ads
Community Album
Photo Ad Archives

Research & Info
Articles
Tractor Registry
Tip of the Day
Safety Cartoons
Tractor Values
Serial Numbers
Tune-Up Guide
Paint Codes
List Prices
Production Nbrs
Tune-Up Specs
Torque Values
3-Point Specs
Glossary

Miscellaneous
Tractor Games
Just For Kids
Virtual Show
Museum Guide
Memorial Page
Feedback Form

Yesterday's Tractors Facebook Page

  
Tractor Talk Discussion Board

Design fabrication of a prestressed concrete beam


[ Expand ] [ View Replies ] [ Add a Reply ] [ Return to Forum ]

Posted by dpendzic on March 19, 2018 at 10:52:03 from (47.18.206.102):

Since many of you seem interested In this concrete bridge failure i will quickly go thru the basic points:

Deign---the span and loading are determined and the appropriate beam is selected--box beam,i beam,t beam,flat slab.
Most highway bridges are built to support the maximum semi load of 40 tons per lane
The beam chosen is anaylized as to how much prestreesing is needed and the number and location of the cables are placed
Most cable patterns are on a 2 inch grid and the CG of the cables is toward the lower part of the beam--so to impart a high compression force in the bottom of the beam and minimal tension at the top.

Fabrication--a flat casting bed is used,either concrete or steel plate,4 to 8 ft wide, and 100 to 300 ft long. forms are made to form the sides of the beam. Rebars,called stirrups, are bent and place inside the forms.
The number and spacing of the strands are placed inside the stirrups for the length of the bed,or beam, or multiple beams in a row.
the strands are pulled to a calculated force, which was determine on length of beam,shrinkage,creep,strand relaxation,temperature drop,etc which all will reduce the strand tension over time--30,000 lb pull is fairly typical

Concrete of the 28 day required strength, 5000 typical,is pored into the form around the stressed strands. It is covered and stem cured overnight to get to 80% of the 28 day strength and check by breaking concrete test cylinders.

The design engineer has determined a cutting pattern and each strand is cut at each end of each beam simultaneously--even with that its amazing to see a 50 ton beam jump all over the casting bed, The high compression forces in the bottom of the beam and minimal tension on the top makes the beam arch upward in the middle--called camber,

The forms having been stripped already the beam is lifted gently and set in a storage area, covered so it can continue moist curing for 7 days and then not shipped until more concrete test cylinders show the 28 day strength


Replies:




Add a Reply!
You must be Logged In to Post


:
:
:

:

:

:

:

:

:

Advanced Posting Options

: If you check this box, email will be sent to you whenever someone replies to this message. Your email address must be entered above to receive notification. This notification will be cancelled automatically after 2 weeks.

No political comments, hate speech or bigotry of any kind will be tolerated. Violations will be removed and posting privileges may be permanently revoked without notice.



 
Advanced Posting Tools
  Upload Photo  Select Gallery Photo  Attach Serial No List 
Return to Post 
Upload Photos/Videos
Upload one or more videos to your post. Photo filesizes should be less than 300K and Videos, less than 2MB. Formats allowed are gif, jpg, png, ogg, mp4, mov, and avi. Be sure to use filenames without spaces or special characters, and filetypes of 3 digits lower case.

TRACTOR PARTS TRACTOR MANUALS
We sell tractor parts!  We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today. [ About Us ]

Home  |  Forums


Today's Featured Article - Listening to Your Tractor - by Curtis Von Fange. Years ago there was a TV show about a talking car. Unless you are from another planet, physically or otherwise, I don’t think our internal combustion buddies will talk and tell us their problems. But, on the other hand, there is a secret language that our mechanical companions readily do speak. It is an interesting form of communication that involves all the senses of the listener. In this series we are going to investigate and learn the basic rudimentary skills of understanding this lingo. ... [Read Article]

Latest Ad: 2022 John Deere 5045E, 4wd, front end loader and 3rd function with grapple. 120 hrs, 55k new, must sell [More Ads]

Copyright © 1997-2024 Yesterday's Tractor Co.

All Rights Reserved. Reproduction of any part of this website, including design and content, without written permission is strictly prohibited. Trade Marks and Trade Names contained and used in this Website are those of others, and are used in this Website in a descriptive sense to refer to the products of others. Use of this Web site constitutes acceptance of our User Agreement and Privacy Policy

TRADEMARK DISCLAIMER: Tradenames and Trademarks referred to within Yesterday's Tractor Co. products and within the Yesterday's Tractor Co. websites are the property of their respective trademark holders. None of these trademark holders are affiliated with Yesterday's Tractor Co., our products, or our website nor are we sponsored by them. John Deere and its logos are the registered trademarks of the John Deere Corporation. Agco, Agco Allis, White, Massey Ferguson and their logos are the registered trademarks of AGCO Corporation. Case, Case-IH, Farmall, International Harvester, New Holland and their logos are registered trademarks of CNH Global N.V.

Yesterday's Tractors - Antique Tractor Headquarters

Website Accessibility Policy